Engineering & manufacturing

An integrated production path for composite paddle programs.

Material processing, structural engineering, molding, machining, finishing, printing, and quality checks are coordinated around the approved buyer specification.

Production facility

Equipment capacity across core manufacturing steps.

The 10,000 m² facility includes hot-press and cold-press stations, spray-painting machines, CNC engraving machines, and UV printers. Project capacity and lead time should be confirmed for each order.

25Hot-press stations
8Cold-press stations
5Spray-painting machines
8CNC engraving machines
8UV printers
10,000 m²Production facility

Production floor

Composite processing to final graphics

Prepreg production line
Prepreg production line
Carbon fiber yarn creel
Carbon fiber yarn creel
Hot-press equipment
Hot-press equipment
CNC engraving machine
CNC engraving machine
Spray-painting station
Spray-painting station
UV printing machine
UV printing machine

Manufacturing flow

Connected steps, one approved specification.

Material preparation

Select and prepare face materials, core systems, reinforcement, and layup.

Molding & pressing

Form the agreed construction using cold-pressed or thermoformed processes.

Machining & finishing

CNC-profile, finish, paint, texture, and prepare the paddle for graphics.

Graphics & assembly

Apply branding, install components, inspect, and pack to the approved configuration.